Anapra Phase III, Drainage and Utility Infrastructure

Reconstruction of Calle Morroco, from Calle Diaz to the south approximately 760 linear feet, including pavement, drivepads, sidewalk with ADA accessible wheelchair ramps, sanitary sewer, and waterline replacement. All existing street signs will be replaced where the retro-reflectivity is less than desirable

Status

Bidding Closed

Prebid Date4/2/24 10:00am

Bid Date4/16/24 10:00am

Company & Contacts

Wilson & Company
IVAN RODRIGUEZ  

Location

Sunland Park, NM

Reconstruction of Calle Morroco, from Calle Diaz to the south approximately 760 linear feet, including pavement, drivepads, sidewalk with ADA accessible wheelchair ramps, sanitary sewer, and waterline replacement. All existing street signs will be replaced where the retro-reflectivity is less than desirable.