Portis, KS - Water System Improvements Phase 2
Construction of approximately 2,360 linear feet of 6-inch waterline; 734 linear feet of 2-inch waterline; associated directional drill installation where necessary; valves; hydrants; water service connections; water service meters; water service meter pits; connections to system; existing pipeline abandonment; grass seeding; gravel surfacing; erosion control and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Addendum No. 1
(click to expand/collapse)
Addendum No. 1
Name | Size | ||
Addendum No. 1 | 388.3 KB |
Addendum No. 2
(click to expand/collapse)
Addendum No. 2
Name | Size | ||
Addendum No. 2 | 295.2 KB |