Village of Pecos Water System Improvements Phase 2

Base Bid: The Village of Pecos in San Miguel; County will construct 963 LF of 6-inch PVC C-900 DR-18 waterline through open trench methods along Ponderosa Rd. This project also includes installation of fire hydrants and service line connections. Additive Alternate 1: Please note Additive Alternate 1 is pending NMDOT Permits. Additive Alternate 1 is anticipated to be change ordered into the project as soon as the NMDOT Permitting process is complete. Additive Alternate 1 includes 912 LF of 6-inch PVC C-900 DR-18 waterline through open trench methods along NM 50 including installation of fire hydrants and service line connections.

Status

Accepting Bids

Prebid Date 5/13/25 11:00am
Bid Date 5/23/25 11:00am

Company & Contacts

Wilson & Company
Jordyn Romero  
505-348-4160

Location

Pecos, New Mexico

Base Bid: The Village of Pecos in San Miguel; County will construct 963 LF of 6-inch PVC C-900 DR-18 waterline through open trench methods along Ponderosa Rd. This project also includes installation of fire hydrants and service line connections.

Additive Alternate 1: Please note Additive Alternate 1 is pending NMDOT Permits. Additive Alternate 1 is anticipated to be change ordered into the project as soon as the NMDOT Permitting process is complete. Additive Alternate 1 includes 912 LF of 6-inch PVC C-900 DR-18 waterline through open trench methods along NM 50 including installation of fire hydrants and service line connections.

Pre-Bid Meeting (non-mandatory) May 13, 2025 11:00 AM

Bid Opening will be on May 23, 2025 at 11:00 AM

Please send questions to Jordyn Romero at jordyn.romero@wilsonco.com and Ross Gabaldon at ross.gabaldon@wilsonco.com