Park, KS Water System Improvements Phase 3
Water Tower Rehabilitation: Work includes improvements to the water storage tower generally described as vent installation, ladders, ladder gates, riser grate, cable safety climbs, hatch, overflow pipe with flapper/screen, foundation improvements, interior coating system, exterior coating system including lead containment, valves, hydrants, site restoration and all other incidental and appurtenant work required to complete the improvements as shown and specified. Alternate No. 1 shall be a tank mixing system. Alternate No. 2 shall be painting 2 buffalo logos on the tower. Water System Improvements: Work includes furnishing all the labor, materials, and equipment for constructing approximately 600 linear feet of 6-inch waterline; 895 linear feet of 2-inch waterline; associated directional drill installation where necessary; valves; hydrants; water service connections; water service meters; water service meter pits; connections to system; existing pipeline abandonment; grass seeding; gravel surfacing; erosion control and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Project Manual
(click to expand/collapse)

Name | Size | ||
Project Manual | 12.5 MB |