Portis Water System Improvements Phase 3
Water Distribution System Improvements: Work includes furnishing all the labor, materials, and equipment for constructing approximately 1,797 linear feet of 6-inch waterline; 1,562 linear feet of 2-inch waterline; associated directional drill installation where necessary; valves; hydrants; water service connections; water service meters; water service meter pits; connections to system; existing pipeline abandonment; grass seeding; gravel surfacing; erosion control and all other incidental and appurtenant work required to complete the improvements as shown and specified. Alternates: Additional waterline and water service connections in various areas.
Project Manual
(click to expand/collapse)

Project Manual
Name | Size | ||
Project Manual | 7.7 MB |