City of Galva, KS - Water Supply System Improvements
Phase 1 - Bid Package 1
Status
Accepting Bids
Bid Date | 10/2/25 2:00pm |
Location
Galva KS
Water Supply System Improvements: Work includes furnishing all the labor, materials, and equipment for construction of 2”, 4” & 6” PVC water supply line; hydrants, gate valves & appurtenances; gravel surfacing; concrete & asphalt pavement replacement; grass seeding; erosion control; and all other incidental and appurtenant work required to complete the improvements as shown and specified.