Carlos Aguirre Phase 1 - Flood Control Project
earthwork, erosion control, site work, drainage improvements channel construction, curb & gutter, roadway reconstruction, concrete, asphalt paving, signing, striping, traffic control, drainage as needed, and miscellaneous construction as needed.
Construction Plans
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Carlos Aguirre Phase 1_Construction Plans | 22.6 MB |
