Public Projects
Sort by
Date Posted
Bids due in 26 days
10/3/24 2:00pm
Village of Williamsburg, Wastewater System Improvements
Bids due in 26 days
Village of Williamsburg New Mexico
Williamsburg NM
Rehabilitation of Sewers, Manholes and Lift Stations
Bidding Closed
9/5/24 10:00am
Socorro Main Canal Reconstruction Phase II Project
Bidding Closed
Middle Rio Grande Conservancy District
San Acacia/Socorro
The project includes earthwork; removals and fills; construction of shotcrete lined channel; preparation of maintenance roads; grading; riprap; seeding; and installation of new irrigation infrastructure including turnouts and turnout connections.
Bids due in 11 days
9/18/24 10:00am
Village of Milan, Golf Course Lift Station Replacement
Bids due in 11 days
Village of Milan
Village of Milan, NM
Installation of new sewage lift station with an appurtenant valve vault, approximately 300 linear feet of new 4-inch sewer force main, and approximately 60 linear feet of 8-inch gravity sewer main. The existing 4” sanitary sewer line and 4” sewer force main are to be cut and capped to route wastewater flow to and from the newly constructed lift station. The new lift station shall be equipped with new dual submersible pumps with new controls, piping, check valves, and level controls. The new lift station interior concrete surfaces shall be lined with a corrosion-resistant polyurethane coating. The project also includes electrical components, such as installing new controls and extending a 3-phase power to the new lift station site. The new gravity sewer main will connect to and extend from an existing manhole and feature Two (2) new manholes. Construction will include installing concrete pad covering over the area designated for the new lift station site, as well as approximately 92 linear feet of new perimeter chain link fencing to enclose and secure the new lift station facilities. The new perimeter fence will feature a height of 6-feet and a 10-feet wide double chain link gate for drivable access gate and a 3-feet wide walk gate. Construction will include the decommissioning and abandonment of the existing Golf Course Lift Station vaults, including the existing wet well, dry pump vault, and control panel. The salvageable mechanical equipment featured in the existing lift station vaults shall be removed, recovered, and supplied to the Village, prior to demolishing the underground vaults. Abandoning of existing lift station will consist of removing the top wet well to joint and backfilling with excavated spoils to grade. Existing control panels and equipment are to be removed and disposed of. Construction will include extending potable water facilities to the new lift station site through the installation of a new 1” water service line which will feature a new frost proof hydrant and new water meter to service and measure the sanitary water use at the new lift station facility.
Bidding Closed
9/5/24 11:00am
Palco, KS Water System Improvements
Bidding Closed
City of Palco
Palco, KS
Water Treatment Plant: Work includes furnishing all the labor, materials, and equipment for construction of a water treatment plant that includes: excavation; backfilling; grading; 36’x42’ pre-engineered metal building addition; site and building concrete work; architectural work; masonry block construction; process piping; mechanical and electrical equipment; valves, hydrants, & appurtenances; 150 gpm nitrate treatment and regeneration equipment (pre-negotiated by Owner); automated liquid chlorine injection equipment; two centrifugal high service pumps; bathroom/office equipment; generator; existing pressure control shack removal and demolition; on-site raw water tank and appurtenances; on-site nitrate waste tank and appurtenances; piping; gravel surfacing; grass seeding; erosion control; well piping and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Bidding Closed
8/22/24 11:00am
Portis, KS - Water System Improvements Phase 2
Bidding Closed
City of Portis, KS
Portis, KS
Construction of approximately 2,360 linear feet of 6-inch waterline; 734 linear feet of 2-inch waterline; associated directional drill installation where necessary; valves; hydrants; water service connections; water service meters; water service meter pits; connections to system; existing pipeline abandonment; grass seeding; gravel surfacing; erosion control and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Bidding Closed
8/6/24 11:00am
Salina Airport Authority
Bidding Closed
Salina Airport Authority
Salina, KS
Construction of approximately 1,020 feet of 12-inch waterline and associated valves, hydrants, connections, water service connection, and abandonment of existing water main..
Bids due in 3 days
9/10/24 10:00am
Land Port of Entry East Diversion Berm and Flood Control Project
Bids due in 3 days
Luna County
Columbus, NM
LPOE East
Bidding Closed
8/1/24 10:00am
On Call Roadway, Drainage, and Utility Construction Services
Bidding Closed
Wilson & Company
Sunland Park, NM
On Call Roadway, Drainage, and Utility Construction Services