Public Projects

Bids due in 12 days
7/25/24 10:00am
On Call Roadway, Drainage, and Utility Construction Services
Bids due in 12 days
Wilson & Company
Sunland Park, NM
On Call Roadway, Drainage, and Utility Construction Services
Bids due in 11 days
7/24/24 10:00am
Rockhound Road & McCan Road Improvement Project – Re-Bid 1
Bids due in 11 days
Luna County
Luna County
Consists of swale improvements, new driveway culvert crossings, pond grading, intersection culvert crossings and erosion control in Luna County.
Bids due in 3 days
7/16/24 10:00am
REBID Doris Ave. Roadway Improvements Project
Bids due in 3 days
Wilson & Company
Williamsburg, NM
Rebid for REBID for Doris Avenue from Doris Lane to Riverside including full depth hot mix asphalt, sidewalk, base course, geo-grid, subgrade, water line, sewer line, construction staking, material testing, drive pads, and permanent signing and striping.
Bids due in 5 days
7/18/24 2:00pm
City of Belle Plaine, KS - Water Treatment Plant
Bids due in 5 days
City of Belle Plaine, KS
City of Belle Plaine, KS
Construction of a Nitrate Removal Water Treatment Plant
Bids due in 5 days
7/18/24 2:00pm
City of Belle Plaine, KS - Water Supply Improvements
Bids due in 5 days
City of Belle Plaine, KS
City of Belle Plaine, KS
Rehabilitation of 3 water supply wells and new supply line
Bids due in 5 days
7/18/24 2:00pm
City of Belle Plaine, KS - Water Storage Tower
Bids due in 5 days
City of Belle Plaine, KS
City of Belle Plaine, KS
Construction of a 300,000 Gallon Water Tower
Bidding Closed
6/25/24 12:00pm
Washington Ave Water and Wastewater Utilities Replacement Project - CDBG 21-C-NR-I-01-G-14
Bidding Closed
Wilson & Company
City of Grants
Reconstruction of approximately 2,120 LF of sewer main trunk line, pipe sizes are 14” and 18”. Infrastructure begins at the intersection of Washington Ave. and Anderman St. connecting to infrastructure from the Jefferson Ave.
Bidding Closed
7/11/24 11:00am
Oketo, KS Water Supply System Improvements
Bidding Closed
Wilson & Company
Oketo, KS
Work includes furnishing all the labor, materials, and equipment for construction of an elevated FRP building; excavation; backfilling; grading; site and building concrete work; process piping; mechanical and electrical equipment; valves & appurtenances; liquid chlorine equipment; one submersible well pump; Well pitless unit; piping; installation of 110 L.F. of 2” HDPE and 70 L.F. of 4” PVC piping; air releases; hydrants; valves and appurtenances; gravel surfacing; grass seeding; erosion control; well piping and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Bidding Closed
6/11/24 11:00am
Portis, KS Bulk Water System Improvements
Bidding Closed
Wilson & Company
Portis, KS
Work includes furnishing all the labor, materials, and equipment for construction of new relocated non-potable water supply submersible well pumps, water supply line, metering and control building, and a bulk water loadout station. Construction includes mobilization; construction staking; erosion control; approximately 273 linear feet of 2 and 3-inch PVC waterline; two submersible well pumps and well heads; metering and control building; bulk water loadout station; self-draining pit; grass seeding; Coordination with KDOT Roadway/Bridge replacement construction; electrical improvements and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Bidding Closed
7/1/24 2:00pm
East Aztec Arterial Route Phase II - F100091
Bidding Closed
City of Aztec
City of Aztec
ITB 2024-849; CN F100091