Public Projects

Bids Due in 17 days
10/2/25 2:00pm
City of Galva, KS - Water Storage Tank
Bids Due in 17 days
Wilson & Company
Galva KS
Phase 1 - Bid Package 2
Bids Due in 17 days
10/2/25 2:00pm
City of Galva, KS - Water Supply System Improvements
Bids Due in 17 days
Wilson & Company
Galva KS
Phase 1 - Bid Package 1
Bids Due in 24 days
10/9/25 12:00pm
Shovel Ready Water Projects 1
Bids Due in 24 days
Wilson & Company
City of Truth or Consequences
Installation of water lines, meters, and a storage tank.
Bids Due in 9 days
9/24/25 1:00pm
Electronic bidding
Garden City KS Spruce & Fleming Traffic Signalization
Bids Due in 9 days
Wilson & Company
Garden City, KS
Construction of a new traffic signal system, sidewalk, ramps, signing, pavement markings, temporary traffic control, and ancillary work, at the Spruce Street and Fleming Street intersection in Garden City Kansas.
Bids Due tomorrow at 11:00am
9/16/25 11:00am
Portis Water System Improvements Phase 3
Bids Due tomorrow at 11:00am
City of Portis, KS
Portis, KS
Water Distribution System Improvements: Work includes furnishing all the labor, materials, and equipment for constructing approximately 1,797 linear feet of 6-inch waterline; 1,562 linear feet of 2-inch waterline; associated directional drill installation where necessary; valves; hydrants; water service connections; water service meters; water service meter pits; connections to system; existing pipeline abandonment; grass seeding; gravel surfacing; erosion control and all other incidental and appurtenant work required to complete the improvements as shown and specified. Alternates: Additional waterline and water service connections in various areas.
Bidding Closed
8/20/25 12:00pm
Laguna Library Addition and Remodel
Bidding Closed
Pueblo of Laguna
29 Rodeo Drive Laguna, NM 87026
The Laguna Library will be remodeling the existing facility to reconfigure office and children's reading room and it will be adding a 1,000sf multipurpose room with a storage and restroom.
Bidding Closed
8/12/25 11:00am
Morland, KS Wastewater Treatment Facility Improvements
Bidding Closed
City of Morland, KS
Morland, KS
General: Work includes furnishing all the labor, materials, and equipment for the construction/improvements at the wastewater lagoon facility. The general overall project improvements include construction staking, mobilization, erosion control, approximately 7.5 acres of grass seeding, corrosion resistant liners, telemetry, and all other incidental and appurtenant work required to complete the improvements as shown and specified. Wastewater Lagoon Facility Improvements: Work includes furnishing all the labor, materials, and equipment for the wastewater lagoon facility improvements. The improvements include approximately 16,930 cubic yards of common excavation, approximately 14,705 cubic yards of earthwork compaction, 341 linear feet of 8-inch PVC lagoon piping, 119 linear feet of 8-inch DIP lagoon piping, 1 Influent Structure, 2 Transfer Structures, 2 Distribution Manholes, 2,907 square yards of Concrete slope erosion protection on Cells 1 and 2; trenching; backfilling; over excavation; compaction; concrete work; site grading; access drive restoration and all other incidental and appurtenant work required to complete the improvements as shown and specified. Alternate No. 1: Work includes furnishing all the labor, materials, and equipment for installing 2,907 square yards Rock RipRap slope erosion protection on the sides of the primary treatment lagoon cells, therefore deleting Concrete slope erosion protection. Alternate No. 2: Work includes furnishing all the labor, materials, and equipment for installing 3,559 square yards Rock RipRap or Crushed Concrete slope erosion protection on the sides of the storage cell.