Shovel Ready Water Projects 1

Installation of water lines, meters, and a storage tank.

Status

Accepting Bids

Prebid Date 9/25/25 12:00pm
Bid Date 10/9/25 12:00pm

Company & Contacts

Wilson & Company
Mark Torres  

Location

City of Truth or Consequences

ADVERTISEMENT FOR BIDS

THE CITY OF TRUTH OR CONSEQUENCES

CITY OF TRUTH OR CONSEQUENCES, NEW MEXICO

CITY OF TRUTH OR CONSEQUENCES SHOVEL READY WATER PROJECTS 1

General Notice: NIGP CODES: 913, 91360, 91392, 54531, 91200, 91216

Issue Date: September 4, 2025

ITB #2025-09-007 Shovel Ready Project 1

The City of Truth or Consequences (Owner) is requesting Bids for the construction of the following Project:

City of Truth or Consequences Shovel Ready Water Projects 1

Bids for the construction of the Project will be received at the City of Truth or Consequences Finance & Purchasing - 505 Sims Street, Truth or Consequences, New Mexico 87901, Thursday October 9, 2025 by 2:00 PM MDT. At 2:00 pm MDT, October 9, 2025, the Bids received will be moved to the Commission Chambers at 405 W 3rd Street, Truth or Consequences, New Mexico 87901 and will be publicly opened and read at 2:15 PM.

The Project includes the following Work:

The project involves the installation of new waterlines, associated appurtenances, and a new water storage tank. The contractor shall provide all labor, materials, equipment, and incidentals necessary to complete the work in accordance with the project plans and specifications.

The scope of work includes the installation of approximately 6,110 linear feet of 12-inch PVC waterline beginning at the existing Cook Street Tank. The alignment continues along Cook Street to Broadway Street, proceeds from Henson Street, and terminates at Morgan Street. This portion of the waterline will be installed within the New Mexico Department of Transportation (NMDOT) right-of-way, specifically located between the shoulder and the edge of the ROW. The installation also includes approximately 80 linear feet of fusible PVC, which will be placed using horizontal directional drilling beneath existing storm drain infrastructure.

Additionally, the project includes the installation of approximately 4,379 linear feet of 10-inch PVC waterline beginning at Pershing Street, proceeding south on Ash Street, then along 8th Avenue, and continuing to Silver Street. This section will be installed using open trench methods within the roadway and will require a 6-foot wide asphalt pavement cut. A utility crossing at Date Street, located within the NMDOT right-of-way, will be completed using the jack-and-bore method, including the installation of an 18-inch steel casing.

The work also involves the installation of approximately 1,036 linear feet of 6-inch PVC waterline along McAdoo Street, beginning east of the Main Street intersection, continuing south along Daniels Street, and ending just north of the Broadway Street intersection. This waterline will be installed by open trenching within the roadway, requiring a 6-foot wide trench and asphalt cut.

Approximately 2,157 linear feet of 8-inch PVC waterline will be installed along 2nd Avenue using open trench methods. This section will also be placed within the roadway, with a trench width and asphalt cut of approximately 4 feet. An additional 40 linear feet of fusible PVC will be installed by horizontal directional drilling beneath existing storm drain infrastructure.

In addition to the waterline work, the project includes the construction of a new 300,000-gallon welded steel water storage tank at the existing Cook Street tank site. Site preparation for the tank will include clearing and grubbing, excavation, grading, placement of engineered fill, and subgrade preparation including compaction and testing. A 6-inch gravel pad will be constructed along with the necessary tank foundation. The tank installation includes all associated piping, valves, and appurtenances required for integration with the existing system. Electrical work will consist of conduit installation, wiring, lighting, instrumentation, and all other components necessary for tank operation. A complete cathodic protection system will also be provided and installed as part of the tank construction.

 

Bids are requested for the following Contract: Truth or Consequences Shovel Ready Water Projects 1/ 25-000-159-00/ City of Truth or Consequences Bid No. 2025-09-007

Obtaining the Bidding Documents

The Issuing Office for the Bidding Documents is:

Wilson & Company, Inc., Engineers and Architects

4401 Masthead St. NE Suite 150

Albuquerque, NM 87109

Prospective Bidders may obtain sets of the bidding documents free of charge by downloading and printing them from the following website:

https://www.wilsoncoplanroom.com/projects/public

Partial sets of the Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office.

 

Pre-bid Conference

A mandatory pre-bid conference for the Project will be held on Thursday September 25, 2025 at 10:00 AM at the City of Truth or Consequences’ Commission Chambers located at 405 West Third Street, Truth or Consequences, New Mexico 87901. Bidders who do not attend the mandatory pre-bid conference will not be eligible to submit bids.

Instructions to Bidders.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

 

This Advertisement is issued by:

Owner:  The City of Truth or Consequences

By:         Gary Whitehead

Title:      City Manager

Date:     08/25/2025