Village of Pecos Water System Improvements Phase 2
Base Bid: The Village of Pecos in San Miguel; County will construct 963 LF of 6-inch PVC C-900 DR-18 waterline through open trench methods along Ponderosa Rd. This project also includes installation of fire hydrants and service line connections. Additive Alternate 1: Please note Additive Alternate 1 is pending NMDOT Permits. Additive Alternate 1 is anticipated to be change ordered into the project as soon as the NMDOT Permitting process is complete. Additive Alternate 1 includes 912 LF of 6-inch PVC C-900 DR-18 waterline through open trench methods along NM 50 including installation of fire hydrants and service line connections.
Addendum 001
(click to expand/collapse)

Name | Size | ||
PECOS P2_Addendum 1 | 97.2 MB |
Addendum 002
(click to expand/collapse)

Name | Size | ||
PECOS P2_Addendum 2 | 1.3 MB |
Bid Opening Sign In
(click to expand/collapse)

Name | Size | ||
Pecos P2_Bid_Sign-In | 71.2 KB |
Bid Tabulation
(click to expand/collapse)

Name | Size | ||
BID EVAL. PEOCS P2 | 65.3 KB |