Village of Pecos Water System Improvements Phase 2
Base Bid: The Village of Pecos in San Miguel; County will construct 963 LF of 6-inch PVC C-900 DR-18 waterline through open trench methods along Ponderosa Rd. This project also includes installation of fire hydrants and service line connections. Additive Alternate 1: Please note Additive Alternate 1 is pending NMDOT Permits. Additive Alternate 1 is anticipated to be change ordered into the project as soon as the NMDOT Permitting process is complete. Additive Alternate 1 includes 912 LF of 6-inch PVC C-900 DR-18 waterline through open trench methods along NM 50 including installation of fire hydrants and service line connections.
Front End Contract Documents
(click to expand/collapse)

Name | Size | ||
100% Pecos WL P2 Front End Docs | 100.6 MB |
Technical Specifications
(click to expand/collapse)

Name | Size | ||
100% Pecos WL P2_Tech Specs | 1.4 MB |